Document


Title

Pre-feasibility assessment: small diameter underutilized (SDU) wood feedstock for a 10 MW co-generation facility at the Milltown dam site
Document Type: Report
Author(s): Emergent Solutions; Christopher Allen and Associates
Publication Year: 2003

Cataloging Information

Keyword(s):
  • Montana
  • Pre-feasibility assessment
  • small diameter underutilized wood feedstock
Region(s):
Partner Site(s):
Record Maintained By:
Record Last Modified: November 12, 2015
FRAMES Record Number: 7545

Description

ANNOTATION: A pre-feasibility assessment is an early stage and limited analysis of the probable risks and returns of an investment. Focused on gathering preliminary information, it helps decision makers determine if there is a basis for investing additional capital and time in the proposed project. This pre-feasibility assessment to explore the potential of using SDU wood from local forests as the feedstock for a 10 MW co-gen plant concept at the Milltown Dam site.

Online Link(s):
Link to this document (163 KB; pdf)
Citation:
Emergent Solutions; Christopher Allen and Associates. 2003. Pre-feasibility assessment: small diameter underutilized (SDU) wood feedstock for a 10 MW co-generation facility at the Milltown dam site. Submitted to U.S. Forest Service-State and Private Forestry, Montana Community Development Corporation, Bonner Development Group.